
Enterasys Xpedition 2000 Getting Started Guide 25
Installing the Hardware
• Attaching console management cables
• Attaching port cables
Verifying Your Shipment
Before you begin installing your XP-2000, check your shipment to ensure that everything you
ordered arrived securely. Enterasys assembles the XP-2000 according to one of the configurations
described in Chassis on page 8 before shipping.
Open the shipping box(es) and verify that you received the following equipment:
• An XP-2000, power cord(s), and a console cable. The console cable is used for connecting a
terminal to the XP-2000’s console port.
• One copy of the Enterasys Xpedition 2000 Getting Started Guide (the book you are reading
now).
• Rack mount kit, including two rack mounting brackets and fastening screws.
Depending on your order, your shipment will also contain the expansion modules you ordered.
Kommentare zu diesen Handbüchern